The 2nd (of 3) design reviews by the design board (for the HOA) where my house is going to be built is done. It was approved on the first try submittal (yay!).
I think the final submittal is basically just the working drawings (same thing you submit to the county to get permits). If all goes well, that could be in 5-6 weeks.
Congrats!
Damn, I’m jealous and bummed. We moved in to a 40 year old house on the perfect 1 acre lot a few months ago with the clear intention of tearing it down and building from scratch. Since then, we’ve been going back and forth with desingers and haven’t even gotten the damn basleline design picked out yet 🙁